|
|
||||
|
|
Quality Policy |
Quality Management System (ISO 9001:2000)
|HSSE Policy(ISO 9001:2000)
|
Environmental Managment
System (ISO 14001 : 1996) |
Occupational Health (OHSAS
18001) |
ASME Stamps
|R Stamp
|
IPLOCA
Engineering |
Procurement |
Construction |
Storage Tanks |
Trunk Pipelines |
Pipe Coating |
Static Equipment Fabrication
|
OffShore Structures Fabrication
Human Resources |
Construction Equipment
|
Static Equipment ,
Fabrication Facilities |
OffShore Structure
Fabrication Facilities |
Pipe Coating Facilities
|
Structural Steel Fabrication Facilities
| |||
|
Haoud Elhamra – Skikda Crude Oil Pipeline |
||||
OWNER: |
||||
DESCRIPTIONThis Project is divided into two lots:
Engineering, Procurement and Construction for the two pipelines.
· Total Length 646 Km. · Excavation 2.2 Million m3 · Welding 2.2 Million D.I. · Stations 42 · Crossings 188
|
![]() |
|||
![]() |
||||
![]() |
||||
![]() |
||||
![]() |
||||
|
|
||||
|
|
Copyright 2005 Petrojet. All Rights Reserved |
|
|
Designed and Developed by IT Department - Petrojet |