Quality Policy |
Quality Management System (ISO 9001:2000)
|HSSE Policy(ISO 9001:2000)
|
Environmental Managment
System (ISO 14001 : 1996) |
Occupational Health (OHSAS
18001) |
ASME Stamps
|R Stamp
|
IPLOCA
Engineering |
Procurement |
Construction |
Storage Tanks |
Trunk Pipelines |
Pipe Coating |
Static Equipment Fabrication
|
OffShore Structures Fabrication
Human Resources |
Construction Equipment
|
Static Equipment ,
Fabrication Facilities |
OffShore Structure
Fabrication Facilities |
Pipe Coating Facilities
|
Structural Steel Fabrication Facilities
| ||
|
E-Methanex Methanol Plant |
|||
|
OWNER : E-METHANEX
CLIENT : TECHINT
LOCATION : Damietta – Egypt
DESCRIPTION : One of ECHEM's Master Plan Projects with the aim of building the first Methanol Plant in Egypt with a capacity of 1.3 million ton per year. The facility which is expected to start production in 2009, is located at Damietta on the Mediterranean Sea in Egypt on an area of 700,000 square meters. The EPC contract was awarded to the Italian Company TECHINT who awarded PETROJET the whole of the construction works in the project. PETROJET SCOPE OF WORK: Construction Contractor for the whole 14 Construction Packages in the Projects.
CONTRACT DURATION : 34 Months
|
|||
|
|
|||