Quality Policy |
Quality Management System (ISO 9001:2000)
|HSSE Policy(ISO 9001:2000)
|
Environmental Managment
System (ISO 14001 : 1996) |
Occupational Health (OHSAS
18001) |
ASME Stamps
|R Stamp
|
IPLOCA
Engineering |
Procurement |
Construction |
Storage Tanks |
Trunk Pipelines |
Pipe Coating |
Static Equipment Fabrication
|
OffShore Structures Fabrication
Human Resources |
Construction Equipment
|
Static Equipment ,
Fabrication Facilities |
OffShore Structure
Fabrication Facilities |
Pipe Coating Facilities
|
Structural Steel Fabrication Facilities
| ||
|
Nuayyem Field Development Project Pipelines Package |
|||
|
CLIENT:
Saudi Aramco LOCATION: Eastern Province of Saudi Arabia Description :The Nuayyim oilfield development is a huge multi-package project estimated to cost USD1 billion, and involves the construction of new GOSPs and a revamp of the pipelines and pumping stations to produce 100,000 bpd of crude.. The pipeline contract awarded to PETROJET in December 2006 is considered the first package of the development. PETROJET Scope of Work: The
scope of works on the lump-sum turnkey contract (LSTK) (line pipes
supplied by Aramco) covers the installation of: a 16-inch-diameter,
148-kilometre-long associated gas pipeline from the Nuayyim GOSP to the
Ghazal remote header A; a new 18-inch-diameter crude oil pipeline from
the Nuayyim GOSP to
Contract Duration: 21 Months
| |||
|
|
|||
|