ACTIVITES

SUMED CRUDE OIL STORAGE TANKS (Alex.)

Description:

Design, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.

Scope Of Works:
– Site Preparation.
– Earth Works.
– Civil Works.
– Mechanical Works.
– Electrical & Instrumentation Works.

Work Volume:

Earth Works                                           12,000     m3
Concrete Works                                     4,100       m3
Tanks Erection                                       6,000       ton
Piping                                                     36,000    D. inch
Electrical & Instrumentation Cables     85,000     m

Owner: Arab Petroleum Pipeline Co. (SUMED)
Location: Alexandria - Egypt