Linear Alkyl Benzene Project – Alexandria

 
OWNER: Egyptian Linear Alkyl Benzene Company

 

LOCATION:  Alexandria - Egypt

 

SCOPE OF WORK

Execution of a facility for the production of Linear Alkyl Benzene (LAB) which is a basic product widely used in the detergent industry.

 

Project Duration:      27 Months

 

 

 

WORK VOLUME

Earth Works 200,000 m3
Piles 180,000 lm.
Concrete 130,000 m3
Steel Structures 5,000 Tons
Piping 500,000 Dia. Inch
Equipment Erection 6,300 Tons
Tanks 35 (2,300 Tons)
Equipment Fabrication 45 Units (700 Tons)
  Previous

Back

Next

 

Copyright 2005 PETROJET. All Rights Reserved

                                     

Designed and Developed by IT Department - PETROJET.