Middle Ring Road Development
EPC of civil works for the development of the middle road within the range of the industrial residential interval of 10.5 km. The works also include the construction of 3 bridges in 6th of October City.
EPC for Two-way road (Two-way road of Three-Lane / side) including associated construction works with total Length: 55 km and total width: 23,4 m
Sixth of October City Development Authority
EPC of civil works for the development of the middle road within the range of the industrial residential interval of 10.5 km. The works also include the construction of 3 bridges in 6th of October City.
El-Tor -Sinai
Engineering Authority of Egyptian Armed Forces
Execution of 30 Residential Buildings composed of (4) levels including core, shell and finishing works.
Suez – Egypt
Engineering Authority for Armed Forces
Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.