EL-TOR CITY RESEDINTIAL BUILDINGS
ProjectDetails

Execution of 30 Residential Buildings composed of (4) levels including core, shell and finishing works.

ProjectTypeBuildings
ProjectCountryEgypt
ProjectLocationEl-Tor -Sinai
ProjectClientEngineering Authority of Egyptian Armed Forces
SimilarProjects

GARDENIA RESIDENTIAL BUILDINGS

Cairo – Suez Desert Road

Engineering Authority of Egyptian Armed Forces

GARDENIA RESIDENTIAL BUILDINGS

Execution of the concrete structure and finishes to the number of (20) Residential Buildings composed of Six levels include core, shell and finishes for the project buildings and units.

SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS

Ismailia – Egypt

Engineering Authority for Armed Forces

SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS

A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth. Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia Road tunnels length (TBM) : 5.82 Km – Open Cut: 1.3 Km Internal Diameter: 11.4 m External Diameter: 12.6 m Distance between tunnels : 12.6 m Concrete wall thickness: 60 cm tunnel clear height: 5.5 m lanes number : 2 lanes/each lane width: 3.65 m Tunnel Slope: 3.3% Deepest point of the tunnel 53 m from sea level and 70 m from land level In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m).

Gouna Port Quay wall Rehabilitation

Alexandria

Alexandria petroleum company

Gouna Port Quay wall Rehabilitation

EPC for rehabilitation works of quay walls no. 1,2,3,4 and 5 with total length of 875m and with 12m depth, including civil and electromechanical works.