MEDITERRANEAN NGL DEVELOPMENT
ProjectDetails

A natural gas liquids extraction facility relying on natural gas produced from North East Mediterranean fields (Al Temsah, Port Fouad, Habi, and Akhen) to extract natural gas derivatives. It is designed to process 1100 MMCFD to produce 300 thousand tons of LPG for the local market, 280 thousand tons of propane for export, and million barrel per year of condensates, and to supply the olefin complex in the future with Ethane/Propane mixture by 400 thousand tons per year.

ProjectTypeGAS Production
ProjectCountryEgypt
ProjectLocationPort Said / Damietta - Egypt
ProjectClientUnited Gas Derivatives Company (UGDC) (JV formed o
SimilarProjects

RUMAITHA AND SHANAYEL PROJECT UAE

Rumaitha/Shanayel area

Abu Dhabi Company for Onshore Petroleum Operations

RUMAITHA AND SHANAYEL PROJECT UAE

Part 1 : Rumaitha/Shanayel Production Restoration Rumaitha/Shanayel restoration consists of (14 wells) to compensate production from high GOR wells (6 OP and 8 WAG). All producer wells are expected to be provided with gas lift. It includes two “Ra/Sn Phase III Batch 2” wells brought forward to year 2018 (Ra-122 oil producer and Ra-123 WAG injector). Part 2 : Rumaitha Technical Rate Rumaitha Phase I/II production requires sustaining its 20% technical rate. This requires drilling six (6) oil producers and six (6) WAG injectors, Two oil producers out of the six are “Ra/Sn Phase III Batch 2” wells brought forward and two WAG injectors out of the six injectors are “Ra/Sn Phase III Batch 2” wells which are brought forward. The Batch 2 wells are located in Cluster Y. Production from clusters GG and FF will be routed to CPP phase I/II.

West Delta Gas Plants Development

western desert

Bechtel

West Delta Gas Plants Development

Executing civil, mechanical and electrical works for onshore facilities to connect to five fields in the concession area north of Alexandria and the western Mediterranean with a production capacity of 2.2 billion cubic feet per day. The works include the construction of the Raven gas station with a production capacity of 900 million cubic feet per day and the development of the Burullus gas station to connect to the Giza-Fayum wells to produce 600 million cubic feet, with the aim of increasing gas production to reach 1.6 billion cubic feet of gas and condensate in addition to the Turous Libra field.

Nitrogen fertilizer Complex

Ain El Sokhna

El Nasr co. for intermediate chemicals

Nitrogen fertilizer Complex

Consortuim (Petrojet & thyssenkrupp) in construction of 6 plants with total production capacity up to 1.7 million tons/year