RUMAITHA AND SHANAYEL PROJECT UAE
Part 1 : Rumaitha/Shanayel Production Restoration Rumaitha/Shanayel restoration consists of (14 wells) to compensate production from high GOR wells (6 OP and 8 WAG). All producer wells are expected to be provided with gas lift. It includes two “Ra/Sn Phase III Batch 2” wells brought forward to year 2018 (Ra-122 oil producer and Ra-123 WAG injector). Part 2 : Rumaitha Technical Rate Rumaitha Phase I/II production requires sustaining its 20% technical rate. This requires drilling six (6) oil producers and six (6) WAG injectors, Two oil producers out of the six are “Ra/Sn Phase III Batch 2” wells brought forward and two WAG injectors out of the six injectors are “Ra/Sn Phase III Batch 2” wells which are brought forward. The Batch 2 wells are located in Cluster Y. Production from clusters GG and FF will be routed to CPP phase I/II.