EGYPTIAN LIQUEFIED NATURAL GAS (LNG) PROJECT
ProjectDetails

A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on the Egyptian Mediterranean coast. Technology utilized is the Phillips Optimized Cascade liquefaction technology. The Facility includes 2 Cryogenic Tanks each with a capacity of 140,000 m3, Common Facilities (including Power Generation, Fire Water Systems and Control Building) and Marine Facilities.

ProjectTypeGas Liquefaction
ProjectCountryEgypt
ProjectLocationIdku
ProjectClientBechtel - (Egyptian Liquefied Natural Gas Co. (ELN
SimilarProjects

West Delta Gas Plants Development

western desert

Bechtel

West Delta Gas Plants Development

Executing civil, mechanical and electrical works for onshore facilities to connect to five fields in the concession area north of Alexandria and the western Mediterranean with a production capacity of 2.2 billion cubic feet per day. The works include the construction of the Raven gas station with a production capacity of 900 million cubic feet per day and the development of the Burullus gas station to connect to the Giza-Fayum wells to produce 600 million cubic feet, with the aim of increasing gas production to reach 1.6 billion cubic feet of gas and condensate in addition to the Turous Libra field.

 PHOSPHATE FERTILIZER COMPLEX - PACKAGE 2

Ain-Sokhna

El Nasr Co. for intermediate chemicals

PHOSPHATE FERTILIZER COMPLEX - PACKAGE 2

Joint Venture ( Petrojet- Ballestra ) EPC of phosphate fertilizer complex package 2. The complex includes 5 plants for the production of phosphate, compound fertilizers, and pure phosphoric acid with production capacity of 1.3 million ton/year

AMMONIA/UREA FERTILIZER COMPLEX

Abu Qir -Alexandria

Alexfert co./UHDE Gmbh

AMMONIA/UREA FERTILIZER COMPLEX

The establishment of a complete Ammonia/Urea complex including off sites facilities and interconnection to Abu-Qir (1 & 2) with an Ammonia production capacity of 1200 ton/day and Urea Production Capacity of 1925 ton/day