AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Petroleum Pipelines Co. PPC
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Sultanate of Oman
Petroleum Development Oman
Full Construction scope of 2 pipelines in the middle of Sultanate of Oman, as follow: Fahud Pipeline12”- 46 Km GGP Pipeline 30”- 56 Km
From Dahshour to Aswan
Egyptian Natural Gas Co.GASCO
Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passing Beni Sweif. The project featured crossing over 975 obstacles for roads, canals and railways, the largest of which was the Nile Crossing at Aswan with a total length of 1750 m and water depth of 20m. Line is CS material with pipe diameter (24” to 36”) and total length of 965 Km.