AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)
ProjectDetails

Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room

ProjectTypeCrude oil Pipeline
ProjectCountryEgypt
ProjectLocation
ProjectClientPetroleum Pipelines Co. PPC
SimilarProjects

AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)

Petroleum Pipelines Co. PPC

AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)

Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room

GGP EXPORT PIPELINE & FAHUD WEST LOOP LINE (12”- 46 KM AND 30”- 56 KM)

Sultanate of Oman

Petroleum Development Oman

GGP EXPORT PIPELINE & FAHUD WEST LOOP LINE (12”- 46 KM AND 30”- 56 KM)

Full Construction scope of 2 pipelines in the middle of Sultanate of Oman, as follow: Fahud Pipeline12”- 46 Km GGP Pipeline 30”- 56 Km

UPPER EGYPT GAS PIPELINE

From Dahshour to Aswan

Egyptian Natural Gas Co.GASCO

UPPER EGYPT GAS PIPELINE

Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passing Beni Sweif. The project featured crossing over 975 obstacles for roads, canals and railways, the largest of which was the Nile Crossing at Aswan with a total length of 1750 m and water depth of 20m. Line is CS material with pipe diameter (24” to 36”) and total length of 965 Km.