AL-GAMIL/DAMIETTA (42”-50 KM)
ProjectDetails

Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station

ProjectTypeNatural Gas Pipeline
ProjectCountryEgypt
ProjectLocationDamietta
ProjectClientGASCO
SimilarProjects

UPPER EGYPT GAS PIPELINE

From Dahshour to Aswan

Egyptian Natural Gas Co.GASCO

UPPER EGYPT GAS PIPELINE

Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passing Beni Sweif. The project featured crossing over 975 obstacles for roads, canals and railways, the largest of which was the Nile Crossing at Aswan with a total length of 1750 m and water depth of 20m. Line is CS material with pipe diameter (24” to 36”) and total length of 965 Km.

DUQM PIPELINE (36”-221 KM)

Sultanate of Oman

Oman Gas Company (OGC)

DUQM PIPELINE (36”-221 KM)

Engineering, Procurement and Construction of 36”- 221 Km Pipeline from Saih Nihayda to Duqm Economic Zone

MANIFA UP STREAM PIPELINES

Eastern Province

Aramco

MANIFA UP STREAM PIPELINES

EPC of Crude oil pipelines with 24 “ and total length of 60 Km with a capacity of 900,000 bbl/day in addition to 90 Km water injection pipelines. 24 ” crude P/L 60 Km 20″, 16″ & 10″ water injection P/L 92 Km 20 Scrapers (Launchers & Receivers) Interface & Tie-Ins with 17 Drilling Sites