ERC REFINERY
ProjectDetails

Petrojet scope of work: execution of Civil, Mechanical, E & I works for ERC refinery Upgrading the existing CORC refinery to eliminate 93,000 tons of Egypt’s sulfur emissions. the refinery will convert lowest value fuel oil into middle & light distillates. ERC will have the capacity to produce 4.2 million tons of refined products per year, including 2.3 million tons of Euro V diesel representing more than 50% of Egypt’s current imports & 600,000 tons of jet fuel.

ProjectTypePetrochemical
ProjectCountryEgypt
ProjectLocationMostorod - Qalyoubia
ProjectClientGS Engineering & Construction
SimilarProjects

RUMAITHA AND SHANAYEL PROJECT UAE

Rumaitha/Shanayel area

Abu Dhabi Company for Onshore Petroleum Operations

RUMAITHA AND SHANAYEL PROJECT UAE

Part 1 : Rumaitha/Shanayel Production Restoration Rumaitha/Shanayel restoration consists of (14 wells) to compensate production from high GOR wells (6 OP and 8 WAG). All producer wells are expected to be provided with gas lift. It includes two “Ra/Sn Phase III Batch 2” wells brought forward to year 2018 (Ra-122 oil producer and Ra-123 WAG injector). Part 2 : Rumaitha Technical Rate Rumaitha Phase I/II production requires sustaining its 20% technical rate. This requires drilling six (6) oil producers and six (6) WAG injectors, Two oil producers out of the six are “Ra/Sn Phase III Batch 2” wells brought forward and two WAG injectors out of the six injectors are “Ra/Sn Phase III Batch 2” wells which are brought forward. The Batch 2 wells are located in Cluster Y. Production from clusters GG and FF will be routed to CPP phase I/II.

ETHANE/PROPANE (C2 / C3) MAXIMIZATION

Alexandria – Egypt

Egyptian Natural Gas Company

ETHANE/PROPANE (C2 / C3) MAXIMIZATION

A project aiming at increasing the production of the C2 – C3 by introducing modification in both Amereya LPG recovery plant and the WDGC in addition to the installation of new facilities at both plants. Turbo expander technology is utilized in both plants to maximize C2 and c3 production. The projects scope of work also covers modifications to upgrade the existing process facilities and utilities at both plants.

NEW PETROCHEMICAL COMPLEX

Alexandria - Egypt

JV (TOYO/ ENPPI

NEW PETROCHEMICAL COMPLEX

Construction of a 460,000 ton/year ethylene plant and a 20,000 ton/year butadiene extraction plant as part of Ethydco’s petrochemical complex. The plant is built based on the most advanced ethylene technology of Lummus Technology of the U.S.. Petrojet scope of work: full construction in addition to fabrication of process equipment