Petrojet

Tank Farms

Storage Tank Farms

PETROJET has taken the lead in the execution of storage tank farms  with outstanding achievements in Engineering, procurement and construction of over 300,000 tons of steel storage tanks (Both Cylindrical and Spherical) with capacities up to 175,000 m3 (Cylindrical) and 5000 m3 (Spherical). Also PETROJET scope includes fabrication and installation of double wall Cryogenic tanks for propane and LNG up to 140,000 m3.

SCOPE OF WORK

  •   Project Management.
  •   Engineering.
  •   Procurement & Procurement Services.
  •   Fabrication & Erection (Civil, Mechanical, E & I).
  •   Painting, Insulation, Testing, Calibration & Commissioning.

Yanbu Export Refinery


Execution of all civil & mechanical works for 33 cylindrical tanks and 13 spherical tanks including Interconnections between them, in addition to installation of (6) cylindrical tanks at yanbu SP1

Country : Saudi Arabia | Client : Aramco- Enppi

Lower Fars Heavy oil Development (LFHOD)


Engineering, Procurement, Construction, commissioning & start-up of (26) vertical Tanks Lately, PETROJET lifted the first tank with the height of 5 meters using the Hydraulic jacking method which …

Country : | Client : Heisco

(7) LPG Spherical tanks


Civil, Mechanical and Electrical works for (7) storage tanks with a capacity of 2400m3  

Country : Egypt | Client : Petrogas

(4) LPG Spherical tanks


Civil, Mechanical and Electrical works for (2) storage tanks with a capacity of 4000 m3 and (2) storage tanks  with a capacity of 2400 m3

Country : Egypt | Client : Petrogas

Cylindrical Tanks – Middle East Oil Refinery


Country : | Client : MIDOR Company

TRANS GULF LPG EXPANSION – Ras Bakr


Engineering, Procurement & Construction of spherical Tanks (5000m3/ton )

Country : Egypt | Client : The Egyptian General Petroleum Corporation (EGPC

FUEL & WATER STORAGE TANKS


Engineering, Procurement and Erection of (5) Storage Tanks 25,000 m3 to increase the Storage Capacity at El-Gaya Power Station at South Beirut

Country : | Client : Lebanon Electricity Authority

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII


Construction of 6 x175,000 m3 Cylindrical Tanks with associated Civil, Piping & Electrical works at Ain Sokhna Terminal

Country : Egypt | Client : Arab Petroleum Pipeline Co. (SUMED)

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE III


Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.

Country : Egypt | Client : Arab Petroleum Pipeline Co. (SUMED

Certified: ISO 9001- ISO 14001
ISO 45001 – ISO 26000 – ISO 17025
ASME N – stamps – API Q1 – Hull Structures