Petrojet

Sisi witnesses last day of drilling Martyr Ahmed Hamdy tunnel

22 April 2020

President Abdel-Fattah Al-Sisi witnessed the end of  excavation works of Martyr Ahmed_Hamdi 2 Tunnel. The project was executed by Petrojet under the supervision of the Armed forces of Engineering Authority.

The inaugurated tunnel has two lanes with a length of 4,250 kilometers and a diameter of 11 meters, Chairman of the Armed Forces Engineering Authority Ehab El-Faar said, during the opening ceremony.

The “Martyr Ahmed Hamdy 2” tunnel, which was completely drilled, comes as part of five tunnels in the seaport city, within the framework of Egypt’s 2020 vision.
Eng. Tariq Al Mulla, Minister of Petroleum has attended The event.

The President Abdel-Fattah Al-Sisi thanked Petrojet workers for their achievement and hard work

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures