SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS
ProjectDetails

A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth. Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia Road tunnels length (TBM) : 5.82 Km – Open Cut: 1.3 Km Internal Diameter: 11.4 m External Diameter: 12.6 m Distance between tunnels : 12.6 m Concrete wall thickness: 60 cm tunnel clear height: 5.5 m lanes number : 2 lanes/each lane width: 3.65 m Tunnel Slope: 3.3% Deepest point of the tunnel 53 m from sea level and 70 m from land level In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m).

ProjectTypeCivil and Infrastructure
ProjectCountryEgypt
ProjectLocationIsmailia – Egypt
ProjectClientEngineering Authority for Armed Forces
SimilarProjects

NEW SUEZ CANAL – DRY EXCAVATION PHASE

Suez – Egypt

Engineering Authority for Armed Forces

NEW SUEZ CANAL – DRY EXCAVATION PHASE

Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.

PETROLEUM SPORTIVE CITY

New Cairo – Egypt

Egyptian Sportive Services Co. for Petroleum

PETROLEUM SPORTIVE CITY

Execution of PETROSPORT Sportive City at New Cairo on an area of 45 Feddans including: Outdoor court complex (football, volleyball, basketball, handball, and tennis) Swimming pool • Food court • Stadium

 New Alamein City - 2,300 acres

New Alamein City

New Urban Communities Authority

New Alamein City - 2,300 acres

Engineering, construction and procurement of civil and mechanical works for 2,300 acres in the southern sector of the new city of El Alamein for infrastructure. The project consists of establishing infrastructure networks (a sewage network, rainwater drainage network, a feeding network and an irrigation network).