CAIRO – SUEZ ROAD
EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m
Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.
Cairo – Suez Road
.General Authority for Roads, Bridges & Transp
EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m
Adabiya Port – Egypt
General Authority for the Suez Canal -SCZone
Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City.
Port Said
Port Said Port Authority
Execution of stage II of the Port Said East Port Main Road. The road passes through an area used before for over 20 years as a dumping area for the dredged soil from the Suez Canal, and reached a height of 8m.