Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.

ProjectTypeInfrastructure
ProjectCountryEgypt
ProjectLocationSuez – Egypt
ProjectClientEngineering Authority for Armed Forces
SimilarProjects

CAIRO – SUEZ ROAD

Cairo – Suez Road

.General Authority for Roads, Bridges & Transp

CAIRO – SUEZ ROAD

EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m

DEVELOPMENT OF ADABIYA PORT

Adabiya Port – Egypt

General Authority for the Suez Canal -SCZone

DEVELOPMENT OF ADABIYA PORT

Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City.

PORT SAID EAST PORT MAIN ROAD PHASE II (PORT SAID – EGYPT)

Port Said

Port Said Port Authority

PORT SAID EAST PORT MAIN ROAD PHASE II (PORT SAID – EGYPT)

Execution of stage II of the Port Said East Port Main Road. The road passes through an area used before for over 20 years as a dumping area for the dredged soil from the Suez Canal, and reached a height of 8m.