NOOROS-ABU MADI-EL GAMIL PIPELINE
ProjectDetails

Execution of a Gas Trunk Pipeline with total length of 126 km from Nooros to El Gamil passing by Abu Madi Plant in order to increase the extraction of butane and gas supply to UGDC Company’s plant for increasing Propane production. 1st Pipeline with Diameter 24” and Length 35 km from Nooros Fields Area to Abu Madi Plant. 2nd Pipeline With Diameter 32” and Length 91 km from Abu Madi Plant to El Gamil Plant. Scope of work includes: Polyethylene and Concrete Coating for Pipeline Pipes. Permitting/Land compensation. Backfilling of Manzala Lake for about 2.2 Million m3 of soil. 7 new Valve rooms (1 inside Manzala lake) Receiving facilities in Abu Madi and El Gamil plant About 57 HDD Crossings and 50 Open Cut Crossings. Project Challenges El Manzala Lake Backfilling: 200.000 m3 (35 Km Length). 55 HDD Crossings ( River Nile, El Salam Canal, Fish Farms, Railway, Highways, …etc)

ProjectTypeGas Pipeline
ProjectCountryEgypt
ProjectLocationFrom Nooros to Abu MAdi to El Gamil - Egypt
ProjectClientPETROBEL
SimilarProjects

NEOM (spine water transmission (west)

Tabuk

NEOM

NEOM (spine water transmission (west)

Engineering, Construction and Procurement of Steel Carbon potable water Pipeline 80” with a length of 38 km. The works are being done inside a reinforced concrete culvert with dimensions (11.5 m x 3.5 m) Petrojet works also include E & I, and Pre-Commissioning works Petrojet used special integrated pipeline automatic welding System for welding pipelines 80” used in Neom Project

NEOM (Water Transmission System from OXAGON to GAYAL)

Tabuk

NEOM

NEOM (Water Transmission System from OXAGON to GAYAL)

Engineering, Construction and Procurement of (2) Steel Carbon potable water Pipelines 80” with a total length of 205 km from Oxagon (Desalination plant- Main pumping Station) to Gayal (Valve chamber south). The works are being done inside a reinforced concrete culvert with dimensions (14.5 m x 4 m) Petrojet works also include E & I, Testing and Commissioning works

El Tina-new capital  (42”-165 KM)

New Capital

Egyptian Natural Gas Co. (GASCO)

El Tina-new capital (42”-165 KM)

Construction of 42”-165 km pipeline split into 2 phases; 1st phase is from El-Tina to Abu Sultan with a length of 92 km including 23 HDD crossings. 2nd phase is from Abu Sultan to the Hot Tap of Dahshour P/L at the New Capital with a length of 73 km including 11 HDD crossings.