El Tina-new capital (42”-165 KM)
ProjectDetails

Construction of 42”-165 km pipeline split into 2 phases; 1st phase is from El-Tina to Abu Sultan with a length of 92 km including 23 HDD crossings. 2nd phase is from Abu Sultan to the Hot Tap of Dahshour P/L at the New Capital with a length of 73 km including 11 HDD crossings.

ProjectTypeGas Pipeline
ProjectCountryEgypt
ProjectLocationNew Capital
ProjectClientEgyptian Natural Gas Co. (GASCO)
SimilarProjects

Othmania/Al Hawiyah pipeline 56-56

Enppi

Othmania/Al Hawiyah pipeline 56-56

Executing civil, mechanical, electrical, instrumentation and communication works for the 56-inch line, with a length of 56 km.

downstream pipeline haradh increment (HUG-2)

Al Ahsa

Enppi

downstream pipeline haradh increment (HUG-2)

Part of the expansion of Hawiyah Gas Plant, is the installation of a pipeline network to allow free flowing of 290 mmscfd from Haradh field to Hawiyah Gas Plant. Petrojet scope of work: Construction of civil, mechanical and electrical works of: 56” P/L 56 km 11 open cut crossing with micro tunneling system Hot Tapping pipeline 15 km cable laying

AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)

Petroleum Pipelines Co. PPC

AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)

Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room