Othmania/Al Hawiyah pipeline 56-56
Executing civil, mechanical, electrical, instrumentation and communication works for the 56-inch line, with a length of 56 km.
Construction of 42”-165 km pipeline split into 2 phases; 1st phase is from El-Tina to Abu Sultan with a length of 92 km including 23 HDD crossings. 2nd phase is from Abu Sultan to the Hot Tap of Dahshour P/L at the New Capital with a length of 73 km including 11 HDD crossings.
Enppi
Executing civil, mechanical, electrical, instrumentation and communication works for the 56-inch line, with a length of 56 km.
Al Ahsa
Enppi
Part of the expansion of Hawiyah Gas Plant, is the installation of a pipeline network to allow free flowing of 290 mmscfd from Haradh field to Hawiyah Gas Plant. Petrojet scope of work: Construction of civil, mechanical and electrical works of: 56” P/L 56 km 11 open cut crossing with micro tunneling system Hot Tapping pipeline 15 km cable laying
Petroleum Pipelines Co. PPC
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room