Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station

ProjectTypeNatural Gas Pipeline
ProjectCountryEgypt
ProjectLocationDamietta
ProjectClientGASCO
SimilarProjects

downstream pipeline haradh increment (HUG-2)

Al Ahsa

Enppi

downstream pipeline haradh increment (HUG-2)

Part of the expansion of Hawiyah Gas Plant, is the installation of a pipeline network to allow free flowing of 290 mmscfd from Haradh field to Hawiyah Gas Plant. Petrojet scope of work: Construction of civil, mechanical and electrical works of: 56” P/L 56 km 11 open cut crossing with micro tunneling system Hot Tapping pipeline 15 km cable laying

UPPER EGYPT GAS PIPELINE

From Dahshour to Aswan

Egyptian Natural Gas Co.GASCO

UPPER EGYPT GAS PIPELINE

Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passing Beni Sweif. The project featured crossing over 975 obstacles for roads, canals and railways, the largest of which was the Nile Crossing at Aswan with a total length of 1750 m and water depth of 20m. Line is CS material with pipe diameter (24” to 36”) and total length of 965 Km.

AL-GAMIL/DAMIETTA (42”-50 KM)

Damietta

GASCO

AL-GAMIL/DAMIETTA (42”-50 KM)

Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station