NAQ PIII ABU-QIR
ProjectDetails

Fabrication, Load Out and Sea-Fastening of platform with a total Weight of 3210 Ton and Water Depth : 33 M

ProjectTypeplatform
ProjectCountryEgypt
ProjectLocationAlexandria
ProjectClientAbu Qir Petroleum
SimilarProjects

ZOHR CONTROL PLATFORM

Petrojet Maadia yard

PETROBEL

ZOHR CONTROL PLATFORM

Fabrication, Load out & sea-fastening of weight : 6000 Ton and Water Depth : 90 m

AL-AMAL PLATFORM

Red Sea

Aquaterra

AL-AMAL PLATFORM

Engineering, procurement, fabrication and Load Out and Sea-Fastening of platform with total Weight 1055 Ton Water Depth : 25 M

  Baltim South West - 5873 ton

Nile Delta- Baltim concession area

PETROBEL

Baltim South West - 5873 ton

Fabrication, Pre-commissioning, Load out, Sea Fastening & assistance for offshore commissioning & Start-up of Baltim platform in the Mediterranean sea to connect 6 wells from Nodoco plant to Abo-Madi/Al Qoraa area with onshore pipeline 26’-18km. It’s expected to increase production capacity to 700 mm2/D