SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE III
Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.
EPC of civil, mechanical and electrical works for 3 GAS OIL Storage tanks, 2 capacity of 40,000 m3 + 1 capacity of 20,000 m3 and 3 LPG Tanks of capacity 50,000 m3. The works includes of Steel structures, pipes and pipeline works
Alexandria
Arab Petroleum Pipeline Co. (SUMED
Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.
South Beirut
Lebanon Electricity Authority
Engineering, Procurement and Erection of (5) Storage Tanks to increase the Storage Capacity at El-Gaya Power Station at South Beirut plus rebuilding the damaged exsisting tanks
Alexandria, Egypt
Petrogas
Execution of Civil, Mechanical and Electrical works for (7) storage tanks with a capacity of 2400m3.