Petrojet

Martyr Ahmed Hamdy tunnel 2

Petrojet completed construction of Martyr Ahmed Hamdy tunnel 2

The  tunnel has two lanes with a length of 4,250 kilometers and a diameter of 11 meters, 

The “Martyr Ahmed Hamdy 2” tunnel, which was completely drilled, comes as part of five tunnels project in the seaport city, within the framework of Egypt’s 2020 vision.

The project was executed by Petrojet under the supervision of the Armed forces of Engineering Authority.


Project Type :
Tunnel
Location :

Country :
Egypt
Client :
the Armed forces of Engineering Authority

Certified: ISO 9001- ISO 14001
ISO 45001 – ISO 26000 – ISO 17025
ASME N – stamps – API Q1 – Hull Structures